The two road engine shed almost complete. It is long enough to take the 
	Duchess, which will be the longest engine on the layout. Weathering is the 
	major outstanding work to be completed. The kit comes from Heljan, a Danish 
	company.  
	
	
 Two other elements for the new layout. On the left the first stage build 
	of the signal box and on the right a structure known as a Parachute Water 
	Crane. Both designs are of Midland Railway origin. The kits being from MNB 
	Models.